Basic facts approximately engineering.
Site Engineer have to be recognized approximately those terms
Concrete Grade
M5 = 1:four:eight
M10= 1:three:6
M15= 1:2:four
M20= 1:1.five:three
M25= 1:1:2
Concrete cowl for all components of structures.
Clear Cover to
Main Reinforcement :
1.FOOTINGS : 50 mm
2.RAFT FOUNDATION.TOP : 50 mm
3.RAFT FOUNDATION.BOTTOM/SIDES : seventy five mm
4.STRAP BEAM : 50 mm
5.GRADE SLAB : 20 mm
6.COLUMN : forty mm
7.SHEAR WALL : 25 mm
8.BEAMS : 25 mm
9.SLABS : 15 mm
10.FLAT SLAB : 20 mm
11.STAIRCASE : 15 mm
12.RET. WALL : 20/ 25 mm on earth
13.WATER RETAINING STRUCTURES : 20/30 mm
Basic facts approximately engineering.
Weight of metal
These formulation use for discover the load of metal
in 1 meter
D^2/162 or d^/533
Weight of Rod Per Meter Length : Dia weight Per Meter
:
6mm = 0.222Kg
8mm = 0.395 Kg
10mm = 0.616 Kg
12mm = 0.888 Kg
16mm = 1.578 Kg
20mm = 2.466 Kg
25mm = three.853 Kg
32mm = 6.313 Kg
40mm = nine.865 Kg
Basic facts approximately engineering.
Conversion factor
Unit Conversions:
1feet-0.3048m
1m-three.28ft
1sq.m-10.76sq.ft
1cu.m-35.28cu.ft
1acre-43560sq.ft
1cent-435.6sq.ft
1hectare-2.47acre
1acre-100cent-4046.724sq.m
1ground-2400sq.ft
1unit-100cu.ft-2.eighty three cu.m 1 square-100sq.
Find the quantity of metal
1M Length Steel Rod its Volume :
V=(Pi/four)*Dia x Dia X L=(three.14/four)x D x D X 1
(for1m period) Density of Steel=7850 kg/ cub meter
Weight =
Volume x Density=
(three.14/four)x D x D X1x7850 (if D is in mm ) So =
((three.14/four)x D x D X1x7850)/(1000x1000) = Dodd/162.27
Concrete blend designs .
Design Mix M10 :
M10 ( 1 : three.92 : five.62)
Cement : 210 Kg/ M three
20 mm overwhelm: 708 Kg/ M three
12.five mm overwhelm : 472 Kg/ M three
River sand : 823 Kg/ M three
Total water : 185 Kg/ M three
Fresh concrete density: 2398 Kg/M three
Design Mix M20 :
M20 ( 1 : 2.48 : three.55)
Cement : 320 Kg/ M three
20 mm overwhelm : 683 Kg/ M three
12.five mm overwhelm : 455 Kg/ M three
River sand : 794 Kg/ M three
Total water : 176 Kg/ M three
Admixture : 0.7%
Fresh concrete density: 2430 Kg/ M three
Design Mix M25 :
M25 ( 1 : 2.28 : three.27)
Cement : 340 Kg/ M three
20 mm overwhelm: 667 Kg/ M three
12.five mm overwhelm : 445 Kg/ M three
River sand : 775 Kg/ M three
Total water : 185 Kg/ M three
Admixture : 0.6%
Fresh concrete density: 2414 Kg/ M three
Note: sand 775 + 2% moisture, Water185 -20.five=164
Litres, Admixture = 0.five% is 100ml
Design Mix M30 :
M30 ( 1 : 2 : 2.87)
Cement : 380 Kg/ M three
20 mm overwhelm: 654 Kg/ M three
12.five mm overwhelm: 436 Kg/ M three
River sand : 760 Kg/ M three
Total water : 187 Kg/ M three
Admixture : 0.7%
Fresh concrete density: 2420 Kg/ M three
Note: Sand = 760 Kg with 2% moisture(170.80+15.20)
Design Mix M35 :
M35 ( 1 : 1.79 : 2.fifty seven)
Cement : 410 Kg/ M three
20 mm overwhelm: 632 Kg/ M three
12.five mm overwhelm 421 Kg/ M three
River sand : 735 Kg/ M three
Total water : two hundred Kg/ M three
Admixture : 0.7%
Fresh concrete density: 2400 Kg/ M three
Note: sand = 735 + 2%,
Water = two hundred- 14.7 =185.30,
Admixture = 0.7�signal
Mix M40 :
M40 ( 1 : 1.67 : 2.39)
Cement : 430 Kg/ M three
20 mm overwhelm: 618 Kg/ M three
12.five mm overwhelm : 412 Kg/ M three
River sand : 718 Kg/ M three
Water Cement ratio : 0.43
Admixture : 0.7%
Note: Sand = 718 + Bulk age 1�signal
Mix M45 :
M45 ( 1 : 1.58 : 2.26)
Cement : 450 Kg/ M three
20 mm overwhelm : 626 Kg/ M three
12.five mm overwhelm: 417 Kg/ M three
River sand : 727 Kg/ M three + Bulk age 1%
Water Cement ratio : 0.43
Admixture : 0.7�signal
Mix M50 :
M50 ( 1 : 1.44 : 2.23)
Cement : 450 Kg/ M three
20 mm overwhelm: 590 Kg/ M three
12.five mm overwhelm: 483 Kg/ M three
River sand : 689 Kg/ M three + Bulk age 12%
Water Cement ratio : 0.36 (188 Kg)
Admixture : 1.20percentthree
Micro silica : 30 Kg
Super waft 6.7% of cement
Brick Work
brick work |
Bricks:
1 cubic meter includes 500 bricksThe Standard length
of the first elegance brick is 190mmx 90mm x90mm and motor joint have to be
10mm thickSo brick with motor=two hundred x one hundred x one hundred.Volume of
1st elegance brick = 0.19 x 0.09 X 0.09 =0.001539cu.m
Volume of 1st elegance brick with motor =0.2 x 0.1
x0.1=0.002cu.mNo. on bricks consistent with 1cu.m= 1/quantity of1st elegance
brick with motor=1/0.002=500 no’s of bricks
Basic facts approximately engineering
Standard
conversion
Standard Conversion Factors :
INCH = 25.four MILLIMETRE
FOOT = 0.3048 METRE
YARD = 0.9144 METRE
MILE = 1.6093 KILO-METER
ACRE = 0.4047HECTARE
POUND = 0.4536 KILOGRAM
DEGREE FARENHEIT X five/nine – 32 = DEGREE CELSIUS
MILLIMETRE= 0.0394
INCHMETRE = three.2808
FOOTMETRE = 1.0936YARD
A rope having period 100cm.You can shape any form the
usage of this rope (Example: Triangle,Rectangle, etc.,). Which form will covers
most area
1 Newton = o.101971 kg
1 mm2 = 0.01 cm2
1 cm2 = one hundred mm2
1 mm2 = 20 N100 mm2 = 2000N
1 cm2 = 2000N2000 N = 203.942 kgSo 20 N/ mm2 = 203.942
kg / cm2
Ratio As consistent with IS 1:1.five:three :
then quantity is 1+1.five+three=five.five and
the overall quantity for the usage of blend=1.fifty
seven m3
then cement required=
1/five.five*1.fifty seven=0.285m3*1440=411 kg.
(eight+bag)
sand requried=1.five/five.five*1.fifty seven=0.471m3
combination required=three/five.five*1.fifty seven=0.853m3
the same old quantity of dry blend mortar=1.fifty
seven.. U can test it in IS code also.
Then quantity is1+1.five+three=five.five and the
overall quantity for the usage of blend=1.fifty seven m3 then cement
required=1/five.five*1.fifty seven=0.285m3*1440=411 kg.(eight+bag)sand
required=1.five/five.five*1.fifty seven=0.471m3aggregate
required=three/five.five*1.fifty seven=0.853m3the general quantity of dry blend
mortar=1.fifty seven.. U can test it in IS code
Material Calculation
Material Calculation : Cement in Bags :
BAGS01. PCC 1:five:10 1440/five*0.forty five 129.60Kg
2.5902.
PCC 1:four:eight(M 7.five) 1440/four*0.forty five
162.00Kg three.2403.
PCC 1:2:four(M 15) 1440/2*0.forty five 324.00Kg
6.4804.
PCC 1:three:6(M 10) 1440/three*0.forty five 216.00Kg
four.320
RCC 1:2:four(M 15) 144/2*0.forty five 324.00Kg 6.4806.
RCC 1:1.five:three(M 20) 1440/1.five*0.forty five
32.00Kg8.6407.
RCC 1:1:2(M 25) 370.00Kg 7.4008.
RCC M 30 410.00Kg eight.2009.
RCC M35 445.00Kg eight.9010.
RCC M40 480.00Kg nine.6011.
Damp Proof CourseCM1:three,20mm tk 1440/three*0.022
10.56Kg 0.2112. 2"tk precast slab
M15 324*0.05 16.20Kg 0.3213. three"tk precast
slab
M15 324*0.half 24.30Kg0.4914.
GC Masonry CM 1:7 1440/7*0.34 70.00Kg1.4015.
Brick Work CM 1:6 1440/6*0.25 60.00Kg 1.2016.
Brick Work CM 1:four, 115tk
1440/four*0.25*0.11510.35Kg 0.2117.
Grano Flooring CC 1:1.five:three 1440/1.five*0.forty
five*0.0521.60Kg 0.4318.
Plastering CM 1:three, 12mm tk 1440/three*0.0146.72Kg
0.1319.
Wall Plastering CM 1:four,12mm tk 1440/four*0.014
five.00Kg 0.1020.
Laying Pressed Tiles Over CM 1:four, 20mm tk
1440/four*0.022 7.92Kg 0.1621.
Ceramic Tiles, Marble,Granite, Caddapah SlabCM 1:four,
20mm tk 1440/four*0.022 7.92Kg 0.1622.
Hollow Block MasonryCM 1:6, 200mm tk/m¬2¬ 10.00Kg 0.20
Sand Calculation in CF
01. Any Concrete Work(PCC, RCC) 0.forty five*35.315=
20.00
02. Damp Proof CourseCM `1:three, 20mm tk 1.00
03. 2"tk Precast slab M15 1.00
04. three"tk Precast slab M15 1.50
05. SS Masonry in CM 1:7 15.00
06. Brick Work in CM 1:6 15.00
07. Brick Work in CM 1:four,115mm tk 2.00
08. Grano Flooring in CC 1:1.five:three 1.00
09. Plastering in CM 1:three, 12mm tk 1.00
10. Wall Plastering CM 1:four, 12mm tk 1.00
11. Laying Pressed Tiles over a CM 1:four, 20mm tk1.00
12. Ceramic Tiles, Marble, Granite, Cuddapah slab CM
1:four, 20mm tk 1.00
Concrete.
01. Any Concrete Work 32.00 cft
02. Grano Flooring in CC 1:1.five:three, 50mm tk
1.60cft
03. Grano Flooring in CC 1:1.five:three, 75mm tk
2.40cft
04. Grano Flooring in CC 1:1.five:three, 100mm tk
three.20cft
05. Bricks/cum 450.00 Nos
06. Size Stone/ cum 90.00 Nos
07. Rough Stone 10.00 cft
08. Bond Stone/ cum 10.00 Nos
09. Cement Paint/one hundred Sft 2.00 Kg
10. White Cement/one hundred Sft 2.00 Kg
11. Janathacem/one hundred Sft 1.50 Kg
12. Enamel Paint/one hundred Sft - 2 Coats 1.25 Litre
13. Wall Putty/one hundred Sft 10.00 Kg
14. Plaster of Paris/one hundred Sft 25.00 Kg
15. Distemper/one hundred Sft 2.00 Kg
16. Cement Primer 0.60 Litre0.forty Litre
17. Weathering CourseLime 12.50 KgBrick bats 32.00 Kg
18. Providing Sand Gravel Mix- CumSand 20.00 CftGravel
forty.00Cft
19.WBM - 75mm tk - 1st Layer - 10 Sqm Metel(60-forty
mm)35.00Cft Gravel 10.00 Cft
20. Pressed Tiles - Sqm 20.00 Nos
21. Hollow Block - 200mm tk 14.00 Nos
CONVERSION TABL
01. 1 RM three.28 Rft
02. 1 Sqm 10.seventy six Sft
03. 1 Cum 35.32 Cft
04. 1 Inch 2.fifty four cm
05. 1 sft 0.09Sqm
06. 1 Acre 0.04 Hectare
07. 1 Hectare 2.forty seven Acres
08. 1 Cft 0.028 Cum
09. 1 Feet 12.00 Inch
10. 1 Feet 0.305 M
11. 1 Cum one thousand.00 Litre
Unit weight
01. Concrete 25 kN/m3
02. Brick 19 kN/m3
03. Steel 7850 Kg/m3
04. Water one thousand Lt/m3
05. Cement 1440 Kg/m3
06. 1Gallon four.eighty one Litres
07. Link eight" = 200mm
08. 1 Hectare 2.471 acr(10000m2)
09. 1 Acr 4046.82m2 = one hundred cent
Development Length :
01. Compression 38d
02. Tension forty seven & 60d
03. 1 Cent 435.60 Sft
04. 1 Meter three.2808 ft
05. 1 M2 10.seventy six ft2
06. 1 Feet 0.3048m
07. 1 KN 100Kg
08. 1kN 1000N
09. 1 Ton 1000Kg = 10,000 N = 10 kN
10. 1 kG nine.81N
Cement Consumption :
M5=2.54Bg/m3,
M7.five=three.18Bg/m3,
M10=four.32Bg/m3,
M20=eight.64Bg/m3,
M25=12.nine Bg/m3,
M40=500+100Kg/m3
Brick:
Water absorption 12 to 15%
Compressive strength = 36Kn/cm2
230mm Wall/m3 = 460 Bricks + 20Cft Sand +66Kg
CementSSM 1:7/m3 = Slize 95 + Soiling eight Cft +60.five KgCurrent = one
thousand Watts = 1 Unit,
No comments: