Estimate:
Estimate is the quantity of of different works or rats on project.
Estimate is the calculating the various
items of work include in the project.
Estimate
for various purposes:
For the cost of building construction.
To be known for calculating the TeX of building.
Fix rent of the building .
For the different item of work include the building work or arrange the available material for construction.
Arrange skills and unskilled labor for construction.
For approval of the government project.
To having the loan for bank.
Type
of estimate :
Following categories of estimate in below.
1 Rough cast estimate on plinth area.
2 Rough cast estimate on cubic constant.
3 Detailed estimate.
4 Annual repair estimate.
5 Complete estimate.
This type of estimate prepared on
the basis of plinth area of building.
Plinth area of building mean Length
x Breadth.
Find the rates and divided the cost with its plinth area .
These documents are attached with estimate.
Drawings plans with specifications
Cost of different services water supply and electric etc.
2 Rough cast estimate on cubic content
Cubic content mean plinth are ×
height of building .
Height taken by the floor top level
to roof to level.
Total cast of construction divide by cubic content =cast per cubic meter or feet
3 Detailed estimate
When the taken approval on rough cast estimate then prepared detailed estimate.
Different type of material rates
Labor rats daily
Machinery rate or carriage
Staff salary
Material shafting
4 Annual repair estimate
After the one year complain of project then mange the repair of different types of works.
Paint renew .
Weather sheet .
Door or window color .
Electric work.
Plumbing work.
Water supply .
Sewerage system work .
Lift or elevator .
Floor tile works repair .
Water tank work.
5 Complete estimate
In which type of estimate in include .
Total coat of construction.
The cost of land .
Expenses towards surveying .
Preparation of plans or estimate.
Payment registration of legal documents.
Payments of texas or services charges .
Its called complete estimate.