RESEARCH METHODOLOGY OF GREEN BUILDING
We follow the
LEED standing system because it was accepted each over the world and have
points which are according to our demand. Now we follow the LEED criteria to
get certify our structure.
Figure 1 US
Green Building Council Standing System
instrument
PROCESS
Only needed
documents are submitted. After you ’ve submitted your operation and paid the
instrument figure, GBCI'll conduct a thorough specialized review. While the
type of review you ’ll suffer will vary depending on your sustainability
pretensions, the specific requirements of your design.
• primary
Review
• Final Review
• Supplemental
Review
Table1 Details about Fee for LEED
Registration
Operations and
conservation freights per structure tableware, Gold and Platinum Level Members
Organizational orNon-members
Registration$,200$,500
Precertification( performance path projects
only-available in Arc)
Flat figure(
per structure)$,000$,000
Expedited
review( reduce from 20- 25 business days to 10- 12, available grounded on GBCI
review capacity)
$,000
instrument
Review Rate Minimum Rate Minimum
Project gross
bottom area( banning parking) lower than,000 sq ft
$0.038/ sf$,900$0.046/ sf$,250
Project gross
bottom area( banning parking),000-,99 sq ft
$0.035/ sf$,500$0.042/ sf$,400
Project gross
bottom area( banning parking),000-,999 sq ft
$0.030/ sf$,500$0.036/ sf$,000
Project gross
bottom area( banning parking),000 sq ft or lesser
Contact GBCI
Contact GBCI
Expedited
review( reduce from 20- 25 business days to 10- 12, available grounded on GBCI
review capacity)
$,000
Appeals
Complex credits
800 per credit
Credits
500 per credit
Expedited
review
500 per credit
Formal
Inquiries
design CIRs
220 per credit
Green building works |
Minimum Program Requirement’s
There are seven
minimal program conditions which should be full filled before the enrollment
process of design. Following are the minimal program conditions
1. Misbehave with environmental laws
2. Be a complete, endless structure
.
Use a reasonable point boundary
4. Misbehave with minimal bottom area
conditions. A minimum of,000 square bases of gross bottom area must be needed.
5. Misbehave with minimal residency
conditions. The LEED design must be enthralled at least one full- time fellow(
FTE) inhabitant
6. Commit to participating whole- structure
energy and water operation data
7. Misbehave with a minimal structure area to
point area rate
STRATEGIES OF LEED
In this section
different conditions and strategies are bandied to check and estimate different
credits mentioned in the chapter.
Table 2 Maximum
Credits Points for each order
order Maximum
Possible Credits
Energy &
Atmosphere( EA) 35
Sustainable
point( SS) 26
Water
Efficiency( WA) 14
Inner
Environmental Quality( IEQ) 15
Material and
coffers( MR) 10
Total 100
SUSTAINABLE point( SS)
Sustainable
point order is divided into following sub orders. All the parameters are
estimated on the triadic nethermost line values.
• point design
• point operation and conservation
• Transportation
• Storm water operation
Table 3 Credits
and Points for Sustainable point
Sustainable
point 26
Credit 1 LEED
Certified Design and Construction 4
Credit 2
Building Exterior and Hardscape Management Plan 1
Credit 3 Integrated
Pest Management, Erosion Control, and Landscape Management Plan 1
Credit 4
Indispensable exchanging Transportation 3 to 15
Credit 5 Site
Development — cover or Restore Open Habitat 1
Credit 6 A
Storm water Quantity Control 1
Credit7.1 A Heat
Island Reduction —Non-Roof 1
Credit7.2 Heat
Island Reduction — Roof 1
Credit 8 Light
Pollution Reduction 1
LEED Certified Design and Construction
To achieve this
credit, our design must be formerly certified by the LEED. Bear instrument
under at least from one of the following standing systems.
• LEED for New
Construction.
• LEED for
seminaries
• LEED for Core
& Shell with 75 of leasable square footage certified under LEED for
marketable Innards.
structure
Exterior & Hardscape Management Plan
Plan includes
the following strategies that must be apply during the structures performance
period at least of 20
• conservation
outfit
• drawing
structure surface
Integrated Pest
Management Plan, Erosion Control and Landscape Management Plan
out-of-door
integrated pest operation to control pest population and help pests from
entering structure and requires the following
• Nonchemical
styles, Routine and Inspection
• exigency
conditions and universal announcement defined
Indispensable
Transportation, Public Transportation Access
Reduce the
negative environmental impacts from auto use, including pollution and land
development by the use of impulses, structure, and/ or programs. Reduce the
number of single inhabitant exchanging passages with conventionally- powered,
conventionally fueled vehicles by sharing in following options
• share in a original or indigenous
program
• Survey every
regular inhabitant or by arbitrary selection of statistically representative
sample check successively for 5 workdays( each day or at the end). In either
case, an 80 response rate is needed.
Site
Development, cover or Restore Open Habitat
Promote
biodiversity and give niche by conserving natural areas and restoring damaged
areas. During the performance period, insure at least 25 of the point area( not
including erecting footmark) or 5 of the point area( including the structure
footmark) whichever is lesser is covered with native or acclimated landscaping.
No comments: